Kirvin Field

An East Texas field redevelopment program built on 14 established wellbores, a 5.13-mile gathering system and multiple producing intervals.

FIELD CONTEXT / 01FREESTONE COUNTY · TEXAS
The regional setting

In the East Texas Basin.
Connected to the field.

The Kirvin / North Mann redevelopment program is situated in Freestone County, southeast of Dallas. The field is located within the East Texas Basin, distinct from the Permian Basin in West Texas.

AP is advancing production optimization and selected recompletions across existing wellbores, with future development guided by field results.

Map from the Kirvin film identifying the Permian Basin near Midland in West Texas and the East Texas Basin with Kirvin southeast of Dallas, along with Austin, Houston and Interstate 45
REGIONAL CONTEXT / KIRVIN / NORTH MANN · FREESTONE COUNTY, TEXASOPEN FULL MAP
ASSET EVIDENCE / 01FIELD OVERVIEW

14 wellbores.
One connected field.

The field map shows 14 existing wellbores across Kirvin / North Mann: nine producing wells in the optimization program and five recompletion targets.

Kirvin / North Mann field map with 14 wellbores, nine producing wells and five recompletion targetsOPEN FULL-SIZE FIELD MAP ↗
AP OPERATING ASSETS / 03KIRVIN / NORTH MANN FIELD INFRASTRUCTURE

Six connected systems.
One field infrastructure network.

Six connected systems support field production, fluid handling, gas gathering and delivery.

5.13 milesGathering pipeline
8-inchMain line
14 wellsConnected across the field
OIL & WATER STORAGEDETAIL FROM THE KIRVIN FILM

The wells behind the signs.

AP Operating oil and water storage tanks and well-register signs at Kirvin / North Mann
AP Operating storage tanks and well-register signs · Kirvin / North Mann
AP Operating well-register sign listing Richardson wells 2, 3 and 4 and Lane wells 2, 3, 4 and 5
AP Operating well-register sign listing Lane wells 6, 7, 8 and 9, Richardson wells 6 and 5, and Adams well 2
FIELD OPERATIONS / 03FIELD SERVICE VIDEO
Field activities / Kirvin

Field work.
In motion.

Field equipment and service activity at Kirvin / North Mann.

KIRVIN / NORTH MANN FIELD OPERATIONS
Project at a glance

The redevelopment
starting point.

14Existing wellbores
~2,200Field acres
9 + 5Production optimization + recompletion workovers
Field program

A sequential
field strategy.

01

Optimize production

Optimize nine existing producing wells through well servicing, upgraded controls and automation.

02

Target recompletions

Complete major workovers and fracture stimulation on five targeted wells to access additional producing intervals.

03

Evaluate expansion

Use geology and field performance to shape subsequent development.

The technical thesis

Multiple
intervals.
One disciplined
approach.

The Kirvin field includes the Rodessa / Sligo, Pettet, Travis Peak and Cotton Valley intervals, creating multiple targets for evaluation through established wellbores.

Read about our approach
Technical context

From the wellbore up

Assess existing well data and field history before committing to the next intervention. Identify the technical objective, model the costs, and evaluate what the results actually show.

Kirvin / technical perspective

The opportunity is
below the surface.

Multiple reservoir intervals can be evaluated through Kirvin’s existing wellbore network, informing the sequence of recompletions and future field development.

Formation in focus

Rodessa / Sligo

Shallower intervals in the Kirvin field’s broader reservoir system.

Kirvin reservoir intervals
Kirvin field asset overview with named wellbores and redevelopment targets
KIRVIN / NORTH MANNThe field behind the plan.

Well-level context across the field.

The project story

Built on
the field data.

The development plan connects existing wellbores, subsurface interpretation and a sequenced field program. AP welcomes direct conversations about the project.

Request project information
Direct dialogue

An investment decision deserves technical detail, operating context, and an informed conversation.